Branch – Boiler tube workshop
Workshop coverage area is 1,229,000.00 square meters. With building area 301,000.00 square meters, and fixed assets 580 million CNY.
Have 1,500 workers, 200 technical workers and 100 engineers.
Equipped with direct-read spectrometer (imported from Germany), handheld alloy analyzer (PMI), metallographic microscope, carbon-sulfur analyzer, endoscope for steel tube, digital hardometer, impact tester, Hydraulic universal mechanical testing machine, etc
4 sets of piercing and hot rolling lines
40 sets of cold drawing lines
40 sets of cold rolling lines
6 sets of Ultrasonic test lines
6 sets of Eddy current test lines
6 sets of tube heat treatment furnaces (Including of two control atmosphere furnaces)
Annual production capacity is 500,000.00 MT